Welcome to the website of the National Bridge Bank

As major clients for infrastructure projects, the cities of Amsterdam and Rotterdam have joined forces with Rijkswaterstaat (Netherlands Directorate-General for Public Works and Water Management) and the Bruggenstichting (Dutch Bridge Foundation) to establish an independent platform for reusing bridges and bridge components.

The objective is to provide all infrastructure authorities with an accessible means of reusing bridges. The integral reuse of bridges that are still in good condition is fully compatible with the Dutch government’s ambition to be climate neutral and to establish a circular economy by 2050.

By reusing rather than demolishing bridges as they become available, we can considerably reduce CO 2 emissions and the use of raw materials. In the years ahead,countless bridges and viaducts will be scheduled for renovation or replacement – each providing an ideal opportunity to contribute to our climate targets. If you have a bridge to offer, let us know – we can offer it through the site. Or if you’re in need of a bridge, we – the Dutch Bridge Foundation – can bring the two parties together.

Of course, reusing a bridge is a challenge. These Guidelines for the Use of Bridges (in Dutch) the steps you need to take if you’re considering reusing a bridge or offering one for reuse.

Which bridge suits your project?

Duikerelementen N9 Alkmaar

Location
Function of the bridge
Material of superstructure
Components
Year of construction2024
Length of bridge1.50 m
Length of main span1.5 m
Width of roadway-
Likely to be available from (date): direct
it-firm
August 11, 2025

Circulair Viaduct (systeem ‘Kampen’ )

Location
Function of the bridge
Material of superstructure
Components
Year of construction2018
Length of bridge-
Length of main span0 m
Width of roadwayModulair – zie systeemspecificatiesBeschikbaar dek met B = 5 x 1,50 = 7,50 m
Likely to be available from (date): Direct beschikbaar
it-firm
August 11, 2025

Brug over Nieuwe Vaart

Location
Function of the bridge
Material of superstructure
Components
Year of construction1939
Length of bridge35.40 m
Length of main span17.5 m
Width of roadway2.10
Likely to be available from (date): medio 2023
it-firm
August 11, 2025

RWS Modulaire brugdeksecties

Location
Function of the bridge
Material of superstructure
Components
Year of construction1960
Length of bridge9.00 m
Length of main span18 m
Width of roadway3
Likely to be available from (date): direct
it-firm
August 11, 2025

Houten Fiets- Voetgangersbrug Delft

Location
Function of the bridge
Material of superstructure
Components
Year of construction2010
Length of bridge15.5 m
Length of main span5 m
Width of roadway4.8
Likely to be available from (date): mei 2025
it-firm
August 11, 2025

Bruggen Oranje Loper

Location
Function of the bridge
Material of superstructure
Components
Year of construction2022
Length of bridge22 m
Length of main span10 m
Width of roadway6
Likely to be available from (date): Periode eind 2025 t/m 2028
it-firm
August 11, 2025

Depot IJmuiden

Location
Function of the bridge
Material of superstructure
Components
Year of construction1973
Length of bridge21.5 m
Length of main span-
Width of roadway-
Likely to be available from (date): Per direct beschikbaar
it-firm
August 11, 2025

Fietsbruggen in de N240 nabij Medemblik

Location
Function of the bridge
Material of superstructure
Components
Year of construction1981
Length of bridge32.2 m
Length of main span8 m
Width of roadway0.5
Likely to be available from (date): Brug 1 Eind 2025 – Brug 2 Medio 2026
it-firm
August 8, 2025

Brug 328

Location
Function of the bridge
Material of superstructure
Components
Year of construction1975
Length of bridge32.20 m
Length of main span30.8 m
Width of roadway2.10
Likely to be available from (date): najaar 2023
it-firm
August 8, 2025

Brug 2274, De Ruijterkade te Amsterdam

Location
Function of the bridge
Material of superstructure
Components
Year of construction2005
Length of bridge31 m
Length of main span31 m
Width of roadwayTotale breedte 10,50 m: fietspad 4,50 m,voetpad 3,00 m en een tussenruimte van3,00 m voor de boogconstructie.
Likely to be available from (date): September 2020
it-firm
August 8, 2025

4 Brugdeksecties

Location
Function of the bridge
Material of superstructure
Components
Year of construction1987
Length of bridge14.6 m
Length of main span14.6 m
Width of roadway2
Likely to be available from (date): per direct
it-firm
August 8, 2025

Tijdelijke Fietsbrug Cruquius

Location
Function of the bridge
Material of superstructure
Components
Year of construction2024
Length of bridge17.9 m
Length of main span9 m
Width of roadway-
Likely to be available from (date): !e kwartaal 2026
it-firm
August 8, 2025