A password will be e-mailed to you
Location | in opslag |
---|---|
Function of the bridge | bicycle bridge |
Material of superstructure | steel |
Components | Stalen spantconstructie |
Year of construction | 2010 |
Length of bridge | 12.3 m |
Length of main span | 12.3 m |
Width of roadway | 3 |
Likely to be available from (date): | direct |
Location | nabij Medemblik |
---|---|
Function of the bridge | bicycle bridge |
Material of superstructure | concrete |
Components | Geen aangeboden onderdeel |
Year of construction | 1981 |
Length of bridge | 32.2 m |
Length of main span | 8 m |
Width of roadway | 0.5 |
Likely to be available from (date): | Brug 1 Eind 2025 – Brug 2 Medio 2026 |
Use the form below to contact us!