A password will be e-mailed to you
Location | Kampen |
---|---|
Function of the bridge | road bridge |
Material of superstructure | concrete |
Components | Direct beschikbaar |
Year of construction | 2018 |
Length of bridge | - |
Length of main span | 0 m |
Width of roadway | Modulair – zie systeemspecificatiesBeschikbaar dek met B = 5 x 1,50 = 7,50 m |
Likely to be available from (date): | Direct beschikbaar |
Location | nabij Medemblik |
---|---|
Function of the bridge | bicycle bridge |
Material of superstructure | concrete |
Components | Geen aangeboden onderdeel |
Year of construction | 1981 |
Length of bridge | 32.2 m |
Length of main span | 8 m |
Width of roadway | 0.5 |
Likely to be available from (date): | Brug 1 Eind 2025 – Brug 2 Medio 2026 |
Location | Ijmuiden |
---|---|
Function of the bridge | Prefab betonliggers t.b.v. brugdekken |
Material of superstructure | concrete |
Components | 30 liggers type HIP 800 |
Year of construction | 1973 |
Length of bridge | 21.5 m |
Length of main span | - |
Width of roadway | - |
Likely to be available from (date): | Per direct beschikbaar |
Location | Amsterdam |
---|---|
Function of the bridge | in opslag |
Material of superstructure | concrete |
Components | 4 brugdeksecties |
Year of construction | 1987 |
Length of bridge | 14.6 m |
Length of main span | 14.6 m |
Width of roadway | 2 |
Likely to be available from (date): | per direct |
Use the form below to contact us!