A password will be e-mailed to you
| Location | Kampen |
|---|---|
| Function of the bridge | Traffic bridge |
| Material of superstructure | Concrete |
| Components | Direct beschikbaar |
| Year of construction | 2018 |
| Length of bridge | - |
| Length of main span | 0 m |
| Width of roadway | Modulair – zie systeemspecificatiesBeschikbaar dek met B = 5 x 1,50 = 7,50 m |
| Likely to be available from (date): | Direct beschikbaar |
| Location | Ijmuiden |
|---|---|
| Function of the bridge | Precast concrete girders for bridge decks |
| Material of superstructure | Concrete |
| Components | 30 liggers type HIP 800 |
| Year of construction | 1973 |
| Length of bridge | 21.5 m |
| Length of main span | - |
| Width of roadway | - |
| Likely to be available from (date): | Per direct beschikbaar |
| Location | nabij Medemblik |
|---|---|
| Function of the bridge | Bicycle bridge |
| Material of superstructure | Concrete |
| Components | Geen aangeboden onderdeel |
| Year of construction | 1981 |
| Length of bridge | 32.2 m |
| Length of main span | 8 m |
| Width of roadway | 0.5 |
| Likely to be available from (date): | Brug 1 Eind 2025 – Brug 2 Medio 2026 |
| Location | Amsterdam |
|---|---|
| Function of the bridge | In storage |
| Material of superstructure | Concrete |
| Components | 4 brugdeksecties |
| Year of construction | 1987 |
| Length of bridge | 14.6 m |
| Length of main span | 14.6 m |
| Width of roadway | 2 |
| Likely to be available from (date): | per direct |
Use the form below to contact us!