Location | Alkmaar |
---|---|
Function of the bridge | in storage |
Material of superstructure | Geen constructiemateriaal bovenbouw |
Components | Geen aangeboden onderdeel |
Year of construction | 2024 |
Length of bridge | 1.50 m |
Length of main span | 1.5 m |
Width of roadway | - |
Likely to be available from (date): | direct |
Location | Kampen |
---|---|
Function of the bridge | road bridge |
Material of superstructure | concrete |
Components | Direct beschikbaar |
Year of construction | 2018 |
Length of bridge | - |
Length of main span | 0 m |
Width of roadway | Modulair – zie systeemspecificatiesBeschikbaar dek met B = 5 x 1,50 = 7,50 m |
Likely to be available from (date): | Direct beschikbaar |
Location | Amsterdam |
---|---|
Function of the bridge | pedestrian bridge |
Material of superstructure | steel |
Components | Stalen bovenbouw |
Year of construction | 1939 |
Length of bridge | 35.40 m |
Length of main span | 17.5 m |
Width of roadway | 2.10 |
Likely to be available from (date): | medio 2023 |
Location | in opslag |
---|---|
Function of the bridge | Road bridges |
Material of superstructure | steel |
Components | Stalen plaatliggerbrug |
Year of construction | 1960 |
Length of bridge | 9.00 m |
Length of main span | 18 m |
Width of roadway | 3 |
Likely to be available from (date): | direct |
Location | Delft |
---|---|
Function of the bridge | Bicycle-Pedestrian Bridge |
Material of superstructure | hout |
Components | Brugdek |
Year of construction | 2010 |
Length of bridge | 15.5 m |
Length of main span | 5 m |
Width of roadway | 4.8 |
Likely to be available from (date): | mei 2025 |
Location | Amsterdam |
---|---|
Function of the bridge | Pedestrian and K&L auxiliary bridges |
Material of superstructure | staal/kunststof |
Components | 8 brugdekkenmet ballusters en de materialen t.b.v. de steunpunten |
Year of construction | 2022 |
Length of bridge | 22 m |
Length of main span | 10 m |
Width of roadway | 6 |
Likely to be available from (date): | Periode eind 2025 t/m 2028 |
Location | Ijmuiden |
---|---|
Function of the bridge | Precast concrete girders for bridge decks |
Material of superstructure | concrete |
Components | 30 liggers type HIP 800 |
Year of construction | 1973 |
Length of bridge | 21.5 m |
Length of main span | - |
Width of roadway | - |
Likely to be available from (date): | Per direct beschikbaar |
Location | nabij Medemblik |
---|---|
Function of the bridge | bicycle bridge |
Material of superstructure | concrete |
Components | Geen aangeboden onderdeel |
Year of construction | 1981 |
Length of bridge | 32.2 m |
Length of main span | 8 m |
Width of roadway | 0.5 |
Likely to be available from (date): | Brug 1 Eind 2025 – Brug 2 Medio 2026 |
Location | Amsterdam |
---|---|
Function of the bridge | Fixed pedestrian bridge |
Material of superstructure | Betonnen brugdek |
Components | Betonnen brugdek |
Year of construction | 1975 |
Length of bridge | 32.20 m |
Length of main span | 30.8 m |
Width of roadway | 2.10 |
Likely to be available from (date): | najaar 2023 |
Location | Amsterdam |
---|---|
Function of the bridge | road bridge |
Material of superstructure | steel |
Components | Complete bovenbouw |
Year of construction | 2005 |
Length of bridge | 31 m |
Length of main span | 31 m |
Width of roadway | Totale breedte 10,50 m: fietspad 4,50 m,voetpad 3,00 m en een tussenruimte van3,00 m voor de boogconstructie. |
Likely to be available from (date): | September 2020 |
Location | Amsterdam |
---|---|
Function of the bridge | in storage |
Material of superstructure | concrete |
Components | 4 brugdeksecties |
Year of construction | 1987 |
Length of bridge | 14.6 m |
Length of main span | 14.6 m |
Width of roadway | 2 |
Likely to be available from (date): | per direct |
Location | Cruquius |
---|---|
Function of the bridge | Allowing slow (cyclists, pedestrians, and maintenance vehicles) to cross the ring canal smoothly and safely without this posing a (fixed) height restriction for shipping |
Material of superstructure | steel |
Components | gehele beweegbare fietsbrug incl. hydraulische bedieningsunit. |
Year of construction | 2024 |
Length of bridge | 17.9 m |
Length of main span | 9 m |
Width of roadway | - |
Likely to be available from (date): | !e kwartaal 2026 |