| Location | Amsterdam |
|---|---|
| Function of the bridge | Pedestrian bridge |
| Material of superstructure | Steel |
| Components | Stalen bovenbouw |
| Year of construction | 1939 |
| Length of bridge | 35.40 m |
| Length of main span | 17.5 m |
| Width of roadway | 2.10 |
| Likely to be available from (date): | medio 2023 |
| Location | in opslag |
|---|---|
| Function of the bridge | Traffic bridges |
| Material of superstructure | Steel |
| Components | Stalen plaatliggerbrug |
| Year of construction | 1960 |
| Length of bridge | 9.00 m |
| Length of main span | 18 m |
| Width of roadway | 3 |
| Likely to be available from (date): | direct |
| Location | Delft |
|---|---|
| Function of the bridge | Bicycle-Pedestrian Bridge |
| Material of superstructure | Wood |
| Components | Brugdek |
| Year of construction | 2010 |
| Length of bridge | 15.5 m |
| Length of main span | 5 m |
| Width of roadway | 4.8 |
| Likely to be available from (date): | mei 2025 |
| Location | Amsterdam |
|---|---|
| Function of the bridge | Pedestrian and K&L auxiliary bridges |
| Material of superstructure | Steel/plastic |
| Components | 8 brugdekkenmet ballusters en de materialen t.b.v. de steunpunten |
| Year of construction | 2022 |
| Length of bridge | 22 m |
| Length of main span | 10 m |
| Width of roadway | 6 |
| Likely to be available from (date): | Periode eind 2025 t/m 2028 |
| Location | Ijmuiden |
|---|---|
| Function of the bridge | Precast concrete girders for bridge decks |
| Material of superstructure | Concrete |
| Components | 30 liggers type HIP 800 |
| Year of construction | 1973 |
| Length of bridge | 21.5 m |
| Length of main span | - |
| Width of roadway | - |
| Likely to be available from (date): | Per direct beschikbaar |
| Location | Amsterdam |
|---|---|
| Function of the bridge | Fixed pedestrian bridge |
| Material of superstructure | Concrete bridge deck |
| Components | Betonnen brugdek |
| Year of construction | 1975 |
| Length of bridge | 32.20 m |
| Length of main span | 30.8 m |
| Width of roadway | 2.10 |
| Likely to be available from (date): | najaar 2023 |
| Location | Amsterdam |
|---|---|
| Function of the bridge | Traffic bridge |
| Material of superstructure | Steel |
| Components | Complete bovenbouw |
| Year of construction | 2005 |
| Length of bridge | 31 m |
| Length of main span | 31 m |
| Width of roadway | Totale breedte 10,50 m: fietspad 4,50 m,voetpad 3,00 m en een tussenruimte van3,00 m voor de boogconstructie. |
| Likely to be available from (date): | September 2020 |
| Location | Amsterdam |
|---|---|
| Function of the bridge | In storage |
| Material of superstructure | Concrete |
| Components | 4 brugdeksecties |
| Year of construction | 1987 |
| Length of bridge | 14.6 m |
| Length of main span | 14.6 m |
| Width of roadway | 2 |
| Likely to be available from (date): | per direct |
| Location | Cruquius |
|---|---|
| Function of the bridge | Allowing slow (cyclists, pedestrians, and maintenance vehicles) to cross the ring canal smoothly and safely without this posing a (fixed) height restriction for shipping |
| Material of superstructure | Steel |
| Components | Gehele beweegbare fietsbrug incl. hydraulische bedieningsunit. |
| Year of construction | 2024 |
| Length of bridge | 17.9 m |
| Length of main span | 9 m |
| Width of roadway | - |
| Likely to be available from (date): | !e kwartaal 2026 |
| Location | Anna-Paulowna |
|---|---|
| Function of the bridge | Traffic bridge |
| Material of superstructure | Steel |
| Components | Stalen bovenbouw |
| Year of construction | 1928 |
| Length of bridge | 53 m |
| Length of main span | 53 m |
| Width of roadway | Spanten h.o.h. 7,40 m,totale breedte ca 12,00 m,geschikt voor 2 (smalle) rijstroken ennaastgelegen wandelpaden. |
| Likely to be available from (date): | Medio 2025 |
| Location | Rotterdam |
|---|---|
| Function of the bridge | Traffic bridge |
| Material of superstructure | Steel |
| Components | Bedieningsgebouw |
| Year of construction | 1990 |
| Length of bridge | - |
| Length of main span | - |
| Width of roadway | - |
| Likely to be available from (date): | Naar verwachting zomer 2027 |
| Location | In depot |
|---|---|
| Function of the bridge | No object function |
| Material of superstructure | Steel |
| Components | Hulpbrug |
| Year of construction | 2020 |
| Length of bridge | 90 m |
| Length of main span | 9 m |
| Width of roadway | 4.23 |
| Likely to be available from (date): | direct |