A password will be e-mailed to you
Location | Nieuwegein |
---|---|
Function of the bridge | pedestrian bridge |
Material of superstructure | steel |
Components | Geen aangeboden onderdeel |
Year of construction | 1999 |
Length of bridge | 72 m |
Length of main span | 40 m |
Width of roadway | 4 |
Likely to be available from (date): | 2025 |
Location | Nieuwegein |
---|---|
Function of the bridge | dubbele ophaalbrug |
Material of superstructure | wood/steel |
Components | brugdekken |
Year of construction | 1885 |
Length of bridge | 14.3 m |
Length of main span | 7.15 m |
Width of roadway | 3.8 |
Likely to be available from (date): | eind 2025 |
Location | Nieuwegein |
---|---|
Function of the bridge | ophaalbrug |
Material of superstructure | wood/steel |
Components | Brugdek |
Year of construction | 1960 |
Length of bridge | 13.7 m |
Length of main span | 13.7 m |
Width of roadway | 4.45 |
Likely to be available from (date): | eind 2025 |
Use the form below to contact us!